Continuous Grade Separation Project Near Keikyu Kamata Station
Orderer | Keikyu Corporation |
---|---|
Completion | 2010 |
Structure and scale | Direct elevated bridge method: 671m; 16 span RC rigid frame bridge |
Location | Tokyo Metropolis |
Application | Railway viaduct |
An elevated bridge was constructed through the direct elevated bridge method between Keikyu Kamata and Koujiya on the Keikyu Airport Line (670m).