Orderer Keikyu Corporation
Completion 2010
Structure and scale Direct elevated bridge method: 671m; 16 span RC rigid frame bridge
Location Tokyo Metropolis
Application Railway viaduct

An elevated bridge was constructed through the direct elevated bridge method between Keikyu Kamata and Koujiya on the Keikyu Airport Line (670m).