• Renewal

Renewal work for Towada area expressway on the Tohoku Expressway

  • Renewal work for Towada area expressway on the Tohoku Expressway
Orderer Tohoku Branch, East Nippon Expressway Co., Ltd.
Completion 2022
Structure and scale Floor slab removal and replacement: 8,900 ㎡
Wall balustrade: 1,600 m
Suspended scaffold: 8,900 ㎡
Measures to retain/keep small pieces from falling: 63,600 ㎡ (Sho-Bond)
Back side cavity injection: 4,500 ㎥ (Sho-Bond)
Location Akita Prefecture
Application Road bridge

This work was done on the section between Ashiro IC and Ikarugaseki IC in the Tohoku Expressway to replace floor slabs of the bridge and to repair the tunnel.