• Railway

Civil engineering work as part of the Kita-Osaka Kyuko Line extension project

  • Civil engineering work as part of the Kita-Osaka Kyuko Line extension project
Orderer Kita-Osaka Kyuko Railway Co., Ltd.
Completion 2023
Structure and scale Mud pressure shield method: Outer diameter Φ6,800mm
Extension L = 1,100m x 2
Vertical driftway construction (Shin-Senri Kita ventilation station) and other work
Location Osaka Prefecture
Application Underground railway

Two tunnels measuring Φ6,200mm in finishing diameter and L = 1,100m and as one Shin-Senri Kita ventilation station were built in association with the Kita-Osaka Kyuko Line extension project.