• Road/Bridge

Reconstruction work for disaster-stricken cut slope in Yoshiwara district along the Chubu Odan Expressway

  • Reconstruction work for disaster-stricken cut slope in Yoshiwara district along the Chubu Odan Expressway
Engineer Tokyo Branch, Central Nippon Expressway Co., Ltd.
Completion 2023
Structure and scale Cut slope excavation V = 102,106m3; rockfall protection fence L = 149.0m, As pavement A = 3,280m2, guardrail L = 98.0m, side ditch L = 232.0m, balancing reservoir in one location, mortar spraying 6,400m2
Location Shizuoka Prefecture
Application Facility for other expressways (high standard roads)