- Road/Bridge
Niho Junction
1999 Japan Construction Engineers' Association Award (Japan Construction Engineers' Association)
| Orderer | Hiroshima Expressway Public Corporation |
|---|---|
| Completion | 2010 |
| Structure and scale | Road improvement length: 450m; 2 abutments; 5 bridge piers; reinforced soil wall: 860m²,; gravity-type retaining wall (H: 3.8m): 239m |
| Location | Hiroshima Prefecture |
| Application | Road |
Improvement work was conducted on the Niho Junction at the end section of Expressway Line 2 (Fuchu Niho Route) accompanying construction of the Hiroshima Expressway Network.